Send Message
Home
Products
VR Show
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Cangzhou Junxi Group Co., Ltd.
Home ProductsSeamless Pipe Fittings

Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch

China Cangzhou Junxi Group Co., Ltd. certification
China Cangzhou Junxi Group Co., Ltd. certification
The product quality is very good, the price is reasonable, the boss is very friendly, looking forward to the next cooperation

—— sara

For our first cooperation, the service of this manufacturer is very good. The product delivery speed is fast and the quality control is very strict

—— lisa

I'm Online Chat Now

Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch

Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch
Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch
video play

Large Image :  Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch

Product Details:
Place of Origin: CHINA
Certification: iso
Model Number: Seamless pipe fitting
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: 5500
Packaging Details: WOODEN BOX OR PLASTIC FILM
Delivery Time: 2 WEEKS
Payment Terms: L/C, T/T
Supply Ability: 50 SET/MONTH
Detailed Product Description
SIZE: 1/2''-24'' NAME: TEE JIS ASME DIN Stainless Steel Seamless Pipe Fittings
Connection: Welding Shape: Equal
Technics: Forged, Forged, Hot Forming Standard: ASME
High Light:

din seamless pipe fittings

,

24 inch seamless pipe fittings

,

jis carbon steel tee

TEE JIS ASME DIN carbon steel Seamless Pipe Fittings

 

 

By process

1. Hydraulic bulging

The hydraulic bulging of the tee is a forming process of compensating the bulging of branch pipe by the axial direction of metal material.The process is to use special hydraulic press, with three links within the tube billet diameter equal injection liquid, through the two horizontal side of the hydraulic cylinder synchronization of the motion of tube billet, billet after squeezed smaller volume, smaller volume of liquid with the tube billet inside the tube billet and pressure, when pressure tee branch pipe bulge out to the metal material in the liquid in the cylinder and the pipe pressure under the dual role of flow along the mold cavity and the branch pipe.

The hydraulic bulging process of the tee can be formed in one time with high production efficiency.The head and shoulder wall thickness of the tee are increased.

2. Hot pressing

Hot pressing is to flatten the pipe billet larger than the diameter of the tee to the diameter of the tee. Cold drawing tee opens a hole in the part of the stretch branch pipe.The tube billet is heated, put into the forming die, and the punching die of the stretch branch pipe is loaded into the tube billet;Under the action of pressure, the tube billet is compressed radially. In the process of radial compression, the metal flows towards the branch tube and forms the branch tube under the stretching of the die.The whole process is formed by the radial compression of the tube billet and the stretching of the branch tube.Different from the hydraulic bulging tee, the metal of the hot pressing tee is compensated by the radial movement of the tube billet, so it is also called radial compensation process.

3. Stitching and forming

Use short pipe welding (or bonding) to form, save material, reduce cost.However, it is necessary to ensure the reliability of the welding (or bonding) process, and make corresponding joint inspection when necessary, such as pressure test, flaw detection, magnetic powder, etc.

4. Forging forming

Because of the limitation of equipment and processing conditions, forging tee is generally of small caliber.Processing costs are relatively high.

 

Type Carbon steel butt welded pipe fitting ANSIB16.9 A234 WPB
Size Seamless tee:1/2"~24" DN15~DN600
Welded tee: 1/2"~100" DN15~DN2500
Wall thickness

sch5s,sch10,sch20,sch30, sch40s,std, sch40,sch60,sch80s,XS,sch80, sch100,

sch120,sch140, sch160, XXS.

Standards ASME B16.9-2007
ASME B16.25-2007
EN10253-1-1999 EN10253-2-2007 EN10253-3-2008 EN10253-4-2008
DIN2605-1-1992 DIN2605-2-1995
JIS B2311-2009 JIS B2312-2009 JIS B2313-2009
GB/T12459-2005 GB/T13401-2005 GB/T10752-2005
SH/T3408-1996 SH/T3409-1996
SY/T0609-2006 SY/T0518-2002 SY/T0510-1998
DL/T695-1999 GD2000 GD87-1101
HG/T21635-1987 HG/T21631-1990
Material

Carbon steel: ASTM/ASME A234 WPB,WPC
Alloy steel: ASTM/ASME A234 WP1-WP12-WP11-WP22-WP5-WP91-WP911
Stainless steel: ASTM/ASME A403 WP 304-304L-304H-304LN-304N
ASTM/ASME A403 WP 316-316L-316H-316LN-316N-316Ti
ASTM/ASME A403 WP 321-321H ASTM/ASME A403 WP 347-347H

Super duplex stainless steel: UNS S31803-UNS S32750
Low-temperature steel: ASTM/ASME A402 WPL 3-WPL 6
High performance: ASTM/ASME A860 WPHY 42-46-52-60-65-70

Surface treatment Transparent oil, rust-proof black oil or hot galvanized
Packing wooden case, pallet or as customers’ requirement
Applications Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
Min order 1 piece
Delivery time 15after receipt of advanced payment
Certification ISO
   

 

Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch 0Tee Jis Asme Din Seamless Pipe Fittings Carbon Steel 24 Inch 1

 

Contact:

 

Darcy Dong


whatspp:0086 15630731167

 

Email:guozhong_darcy@pipefittingsmachine.com

 

Company name: GUOZHONG INTERNATIONAL LIMITED

 

 

Contact Details
Cangzhou Junxi Group Co., Ltd.

Contact Person: Darcy Dong

Tel: 0086 18632745010

Send your inquiry directly to us (0 / 3000)